Engineering

How equipment connects
to the facility.

Rack power, cooling connections, controls and maintenance access all affect the facility design.

THE PHYSICAL FOUNDATION

From the campus
to the cold plate.

Explore the layers around the compute. Follow the power supply and the cooling path as the scale changes.

CONCEPTUAL CUTAWAY · NOT TO SCALE
01 / CAMPUSStructure

SITE & POWER

Start with the site.

A development plan connects the utility interface, buildings and supporting systems. The tenant’s equipment requirements shape the facility brief.

Facility interface
Site rights, utility connection, phasing and access.
Explore this interface

Illustrative equipment and interfaces, not a Lintel installation or an engineering design. Projects are under development; responsibilities and specifications are agreed per project.

Utility supply ≠ critical IT load.

Five aligned equipment cabinets with silver modular shelves and restrained green edge lighting.
Rack and power systems.

What matters

Utility supply serves the whole facility, including cooling and other building systems. Critical IT load is the power required by the IT equipment.

What to check

Connection voltage, capacity, timing, metering, resilience and phased demand.

Documents

Utility information, the electrical design basis and remaining approval conditions.

Discuss this scope ↗
Electrical planning records and original diagram

From utility supply
to critical IT load.

The utility connection serves the whole facility. Critical IT load is the power required by the IT equipment. Keep the two boundaries explicit in capacity and phasing discussions.

From utility supply to critical IT load.
Original system schematic · project design determines the final arrangement.View full-size diagram ↗
01Connection basis
Supply capacity and voltage; connection point; utility conditions; metering boundary; energization date and confirmation status.
02Electrical interface
Tenant equipment load and rack power; protection and distribution; resilience requirements; room for later phases.
03Project record
Site and power assessment, an electrical design basis, and a schedule of open utility and permitting conditions.

From cooling plant to rack.

Liquid-cooling cabinet with a glazed front, stainless-steel piping and a graphite metal enclosure.Facility loop, coolant distribution and rack loopSeparate facility and rack circuits exchange heat through the central coolant distribution unit. Connections are illustrative and do not mark actual equipment ports or installation routing.FACILITY LOOPRACK LOOP
Facility loop, CDU and rack loopA conceptual interface sketch. Separate facility and rack coolant circuits meet at a CDU heat exchanger. It does not specify equipment geometry.FACILITY LOOPCDURACK LOOP
Facility loop · CDU · Rack loopSystem relationships · Illustrative

What matters

Selected hardware sets the heat load and operating envelope.

What to check

Supply and return temperatures, flow, pressure, fluid quality, controls and access.

Documents

Manufacturer references and a project-specific cooling interface schedule.

Discuss this scope ↗
Cooling planning records and original diagram
Facility loop, CDU and rack loopA conceptual interface sketch. Separate facility and rack coolant circuits meet at a CDU heat exchanger. It does not specify equipment geometry.FACILITY LOOPCDURACK LOOP
Facility loop · CDU · Rack loop Concept

A cooling chain,
with defined boundaries.

GB300 combines liquid and air cooling. Vera Rubin uses a fully liquid-cooled architecture. Specify the selected platform’s heat load, coolant and operating envelope across the facility plant, CDU and rack.

A cooling chain, with defined boundaries.
Original system schematic · project design determines the final arrangement.View full-size diagram ↗
01Liquid-cooling interface
Supply and return temperatures, flow rate, pressure, fluid quality, isolation and leak detection requirements, confirmed against the selected equipment.
02Space & connectivity
Rack layout and maintenance clearances; pipe and cable routes; fiber entry and network rooms; residual air-cooling demand.
03Project record
Equipment schedule, cooling interface schedule and coordinated facility layout, with design responsibilities and acceptance criteria.

Connecting modular systems.

Steel bracing, cable trays and connection points.
Service-module detail.
View a modular cutaway concept
Roof-open modular enclosures showing equipment and services.
Conceptual cutaway.

What matters

Prefabricated equipment still needs site works, installation and connections.

What to check

Space, transport, lifting, cabling, fibre routes, network rooms, pipework, controls and maintenance access.

Documents

Coordinated layouts, supplier scopes and agreed interface tests.

Discuss this scope ↗

Tests to agree before handover.

White equipment enclosures and overhead services beside an aisle.
Service access concept.

Technical requirements

List the electrical, cooling, controls and equipment conditions to test at each connection.

Acceptance basis

For each test, agree the method, acceptance criteria, measurements to record and how exceptions will be handled.

Handover

Record who conducts and accepts each test, when it takes place, and what remains unresolved.

Explore acceptance and handover ↗
Handover planning records and original diagram

Make readiness
measurable.

The service date depends on the connection, permits, equipment and construction programme. Define the evidence required at each handover.

Make readiness measurable.
Original system schematic · project design determines the final arrangement.View full-size diagram ↗
01Before construction
Agreed design basis, responsibility matrix, equipment scopes and project approvals; a programme showing utility and long-lead dependencies.
02Before service
Installation inspections, agreed system tests and commissioning results; a register of unresolved items and acceptance conditions.
03Operating handover
Accepted results, equipment and maintenance records, operating responsibilities and the conditions for the next development phase.
Engineering reference / GB300

GB300 liquid cooling.
Start at the rack.

Public reference architectures help make a tenant discussion concrete. The selected hardware and project design establish the actual requirement.

Reference rack schematic showing 18 compute trays, 9 NVLink switch trays, power shelves and cooling connections
Original GB300 diagram based on NVIDIA’s public rack configuration.View full-size diagram ↗

NVIDIA DGX GB300 NVL72 / reference configuration

36CPUs

Grace CPUs per reference rack

72GPUs

Blackwell Ultra GPUs per reference rack

Compute
18 compute trays; four GPUs per tray.
Scale-up network
Nine NVLink switch trays, fifth-generation NVLink.
Scale-out network
ConnectX-8 interfaces support 800 Gb/s networking.
Rack power
AC power shelves feed a DC busbar.
Heat removal
Liquid cooling for CPUs and GPUs, with air cooling for other components.

Technical reference: NVIDIA GB rack hardware guide ↗. Published reference equipment; these figures do not describe Lintel capacity.

From a rack to a cluster +

NVIDIA’s DGX SuperPOD reference architecture uses eight DGX GB300 racks per scalable unit and specifies 1.2 MW TDP for the unit, including network, management and storage systems.

The unit’s TDP covers the combined equipment architecture. It is not a utility connection requirement, a Vera Rubin specification or a Lintel project capacity.

Read the NVIDIA SuperPOD architecture ↗

A different generation.
A different thermal basis.

Vera Rubin infrastructure belongs in the facility brief from the start. Its full-liquid architecture requires a fresh equipment and cooling schedule, with electrical and mechanical interfaces confirmed for the selected system.

Vera Rubin full-liquid cooling schematic: heat rejection, CDU, 45 degree Celsius reference rack inlet, compute and networking
Original Vera Rubin thermal study.View full-size diagram ↗

NVIDIA Vera Rubin NVL72 / published reference

45°C

Published inlet reference · NVIDIA AI factory specification

100%

Liquid-cooled system architecture

Compute & fabric
72 Rubin GPUs and 36 Vera CPUs, connected through sixth-generation NVLink.
Cooling basis
Full-liquid system cooling replaces GB300’s hybrid thermal arrangement. Confirm inlet temperature, flow, pressure and fluid requirements with the selected equipment supplier.
Facility consequence
Evaluate heat rejection against local weather and the operating envelope. Dry-cooler or chiller-free operation depends on climate and system design.

Sources: NVIDIA Vera Rubin specifications ↗ and NVIDIA liquid-cooling architecture ↗. Reference parameters are not a Lintel performance, water-use or capacity guarantee.

Keep each platform’s design basis separate.

GB300

Liquid cooling for CPUs and GPUs, with a remaining air-cooling load. Coordinate both paths.

Vera Rubin

Full-liquid system architecture. Revalidate the thermal and electrical interfaces for the selected configuration.

Sources behind the engineering studies.

  1. NVIDIA / GB300 NVL72 ↗

    72 Blackwell Ultra GPUs and 36 Grace CPUs per reference system. Checked 19 October 2026.

  2. NVIDIA / DGX GB300 hardware guide ↗

    GB300 rack configuration and cooling arrangement. GB rack guide updated 17 September 2026.

  3. NVIDIA / DGX SuperPOD reference architecture ↗

    Eight-rack scalable unit and its equipment-level TDP boundary. GB300 reference architecture, checked 18 October 2026.

  4. NVIDIA / Vera Rubin NVL72 ↗

    Rack configuration, sixth-generation NVLink and 45°C inlet reference, with the vendor’s at-scale AI factory qualification. Checked 19 October 2026.

  5. NVIDIA / Full-liquid cooling architecture ↗

    Rubin thermal architecture and the climate conditions for dry cooling. Published 21 June 2026.

  6. Schneider Electric / Reference Design 109 ↗

    GB200-based public example of facility power, liquid cooling and IT-space coordination. Used for interface methodology, not as a GB300 or Vera Rubin equipment specification. Published 14 March 2026.

  7. Lintel / Public company overview ↗

    Development scope, tenant brief and project responsibility structure. Version 0.15.1, 30 October 2026.

Engineering diagrams are original explanatory studies. Reference equipment, vendor designs and development documents do not represent a completed Lintel project, a certification or a capacity commitment.

The architectural study.

Explore the original Lintel campus model, from site and power to the inside of the facility. This is a conceptual study, not a completed or owned facility.

Explore the 3D study

Tell us about
your project.

Share what you know about the site, equipment and timing. We can start with the questions that are still open.

Non-confidential information first.