Power for compute.
Translate the tenant equipment schedule into distribution, resilience and metering requirements.
COMPANY INTRODUCTION
AI factory infrastructure, from supply chain to site.
partner@lintelinfra.ai
Lintel architectural study · conceptual, not an owned or completed facility.
A coordinated plan shaped around the customer’s compute load.
Establish the site and load requirements, rights and utility evidence, constraints, interconnection route and energization plan.
Define equipment packages and coordinate suppliers across power, cooling and network interfaces, logistics and installation sequencing.
Coordinate construction and installation, commissioning, acceptance records and operating handover against an agreed project scope.
Projects and services are in development. Scope, capability, capacity, delivery timing and commercial commitments are confirmed for each engagement.
Buy a development or delivery scope; add contracted facility services where applicable.
Compute operators and enterprises with a defined facility requirement. Site and power owners engage under a development or cooperation mandate.
Development, engineering and integration milestones; facility capacity, colocation and asset-management fees where contracted. Equipment purchases and project capital stay separate.
Lintel delivers physical infrastructure. INTERTIE operates compute and models. Capacity, acceptance and operating responsibilities connect the two.
Repeat specifications, interfaces and acceptance methods. Site rights, utility evidence, approvals and responsibility remain project-specific.
Our work brings power, liquid cooling and modular systems together, from equipment sourcing and engineering coordination to site integration and delivery.
Land or building rights, site assessment and utility coordination.
Facility design, permits, equipment and construction scope.
Power, cooling, space and connectivity for tenant compute.
Commissioning, operating handover and ongoing project responsibilities.
Our projects are under development. Project list available upon request.
Our development focus includes GB300 liquid-cooled facilities and Vera Rubin infrastructure. Each platform brings a different thermal basis to the power, cooling and building design.
Translate the tenant equipment schedule into distribution, resilience and metering requirements.
For GB300, CPUs and GPUs are liquid-cooled, with air cooling for other components. Vera Rubin's full-liquid architecture changes that design basis.
Coordinate modular electrical and cooling packages, cooling distribution units, pipework and maintenance access with the rack layout.
Technical reference: NVIDIA GB rack hardware guide. Published reference equipment; these figures do not describe Lintel capacity. The design basis is set for the equipment actually selected for each project, including other liquid-cooled platforms.
Clients provide us with a tenant brief that sets out the technical and commercial requirements for their desired facility.
| Requirement | Project specification |
|---|---|
| Location and power | Location, utility supply and critical IT load. |
| Compute environment | Rack density, cooling and connectivity. |
| Delivery | Phasing, installation interfaces and required service date. |
| Commercial | Facility term, service scope and payment structure. |
Utility supply and critical IT load are reported separately.
Lintel or a project company holds the development and facility obligations; engineering partners build; the tenant or compute operator owns the GPUs and runs the cloud.
Each phase produces the information and agreements needed for the next. The programme is set for the particular site, tenant and delivery structure.
Establish the site and power basis.
Phase record:Site assessment · utility information · permit path · open conditions
Define the facility and delivery scope.
Phase record:Design basis · responsibility matrix · cost plan · phased programme
Build and commission the agreed scope.
Phase record:Approved delivery scope · construction progress · commissioning results
Accept, hand over and plan ahead.
Phase record:Acceptance record · operating handover · maintenance and expansion plan
Project capacity is stated with its basis: utility supply, critical IT load and development phase. Service dates depend on the connection, permits, construction and funding programme.
Three ways to start: a tenant brief, a site with power and rights, or a delivery and operating capability.
We welcome enquiries from tenants, landowners and development partners, and delivery and operating partners.
Location, IT load, rack density, service scope and timing.
Site rights, utility information, permits and proposed role.
Specialists in design, permitting, equipment, construction and facility operations.
partner@lintelinfra.ai
Editorial revision: 19 October 2026. Business information is stated as of 14–17 October 2026.
Proposed: scope or terms under discussion, nothing executed. Contracted: executed obligations. Connected: utility connection energized and confirmed. Commissioned: installation tested with accepted commissioning results. Accepted: service or facility acceptance evidenced. Planning targets are not commitments.
It establishes no customer, supplier, capacity or financing commitment. Scope, availability, pricing and legal terms are agreed in individual proposals and contracts.
Page-specific licensing, customer rights, procurement and financing conditions remain next to the relevant content.