0103
LINTELAN ARCHITECTURE OF INFRASTRUCTURE
01 / SITE & POWER
Start with the power.
Match the site to the load: connection capacity, energization date, resilience and room to expand.
Explore site & power ↗PROJECT DELIVERABLEUtility connection basisSupply capacity · connection date · open conditions
SCROLL TO EXPLORE
The infrastructure system
The foundations,
connected.

Site and power qualification, coordinated facility design, and commissioning connect the tenant brief to a usable building. Explore the engineering scope and project stages below.
Explore the development scope ↗Conceptual architecture · illustrative only · not a representation of owned facilities