# Lintel · Company Kit v0.16.0

## Current company presentation / 现行公司表述

Foundations for intelligence.

AI factory infrastructure, from supply chain to site.

Lintel develops AI data centers and colocation facilities. Our work covers site and power planning, equipment sourcing, and the integration of electrical, cooling and modular systems.

Plan supplier interfaces, transport, site works, installation and commissioning together. Agree tests before acceptance; hand over accepted results, equipment documents, operating responsibilities and open items. Utility supply and critical IT load are separate figures.

Projects are under development. Scope, specifications and delivery dates are agreed project by project. The contracts identify who designs, buys, owns, pays for, delivers and operates each part.

Lintel开发AI数据中心和托管设施，工作覆盖场地与电力规划、设备采购协调，以及供配电、冷却和模块化系统的集成。

将供应商接口、运输、现场施工、安装和调试一起安排，先约定验收测试，再移交通过的结果、设备资料、运营责任与未结事项。电网供电容量和关键IT负载分别记录。

项目处于开发阶段；范围、规格和交付日期逐项目商定。设计、采购、权属、付款、交付及运营责任由实际合同明确。

Website presentation checked 2 November 2026. The adopted commercial model and the dated technical references below retain their original scope and evidence dates.



30 October 2026

## Business model

AI infrastructure, from power and site development to facility delivery.

Lintel brings site and power planning, technical supply chains and engineering delivery into one coordinated infrastructure plan. We shape each project around its compute load, equipment requirements and operating needs, connecting development decisions with the systems that must work together on site.

### Power and site development

Establish the site and load requirements, rights and utility evidence, constraints, interconnection route and energization plan. A documented development basis and power plan.

### Technical supply chain

Define equipment packages and coordinate suppliers across power, cooling and network interfaces, logistics and installation sequencing. An equipment schedule, interface matrix and test requirements.

### Facility delivery

Coordinate construction and installation, commissioning, acceptance records and operating handover against an agreed project scope. An accepted handover for the contracted facility scope.

## Customers and commercial model

Our facility customers are compute operators and enterprises with a defined facilities requirement. We also work with site and power owners on development opportunities. Teams seeking model and agent services can engage INTERTIE.ai.

Engagements combine agreed development, engineering and integration milestones with facility capacity, colocation or asset-management services where contracted. Equipment purchases, project capital and asset returns are accounted for separately. The scope identifies the buyer, owner, payer, suppliers and operating responsibilities.

Lintel focuses on physical infrastructure. INTERTIE.ai focuses on compute and model operations for production agents and continuing model improvement. Each can serve external customers independently, with project-specific capacity, acceptance and operating interfaces for joint delivery.

Projects and services are in development. Scope, capability, capacity, delivery timing and commercial commitments are confirmed for each engagement.

## 中文

Lintel连接电力与场地开发、技术供应链和设施交付，从客户算力负载、设备要求及运营需求出发，协调开发决策与供配电、冷却、网络及施工接口。

设施客户包括有明确设施需求的GPU云、算力运营商及企业。土地、电力资源方可按委托成为开发客户、项目参与方或供给伙伴；仅需模型和Agent服务的客户由INTERTIE承接。

收入分别记录为开发、工程和集成里程碑费用，以及有实际合同依据的设施容量、托管或资产管理服务收入。设备采购款、项目资本和资产／股权回报单列；购买方、资产方、付款方、供给方和运营责任按范围确认。

Lintel负责物理基础设施；INTERTIE负责生产Agent所需的计算、模型运行与持续改进。两者可独立获客，并按容量、验收及运营接口协同。

复用设备规格、接口表和验收方法；每个站点的权利、电力、许可及责任重新核实。电网容量、关键IT负载、已安装算力和已验收服务分别记录。

## Reference

YC Data Center Supply Chain is a reference for our interpretation, not an endorsement or affiliation. https://www.ycombinator.com/rfs#data-center-supply-chain

Prepared by Codex.

## Retained brand and engineering reference

## Engineering the facility

### Liquid cooling. GB300 to Vera Rubin.

Our development focus includes GB300 liquid-cooled facilities and Vera Rubin infrastructure. Each platform brings a different thermal basis to the power, cooling and building design.

**Power at the rack.** Translate the tenant equipment schedule into distribution, resilience and metering requirements.

**Platform-specific cooling.** For GB300, CPUs and GPUs are liquid-cooled, with air cooling for other components. Vera Rubin's full-liquid architecture changes that design basis.

**Space for the systems.** Coordinate cooling distribution units, pipework, cable routes and maintenance access with the rack layout.

36 Grace CPUs per GB300 rack · 72 GPUs, NVL72 rack configuration

Technical reference: NVIDIA GB rack hardware guide. Published reference equipment; these figures do not describe Lintel capacity. The design basis is set for the equipment actually selected for each project, including other liquid-cooled platforms.

### How a project advances

Each phase produces the information and agreements needed for the next. The programme is set for the particular site, tenant and delivery structure.

**01 Qualify** Establish the site and power basis. Phase record: Site assessment · utility information · permit path · open conditions

**02 Design** Define the facility and delivery scope. Phase record: Design basis · responsibility matrix · cost plan · phased programme

**03 Deliver** Build and commission the agreed scope. Phase record: Approved delivery scope · construction progress · commissioning results

**04 Operate** Accept, hand over and plan ahead. Phase record: Acceptance record · operating handover · maintenance and expansion plan

Project capacity is stated with its basis: utility supply, critical IT load and development phase. Service dates depend on the connection, permits, construction and funding programme.

Source: Lintel home and Platform pages, checked 19 October 2026; website revision 847bd0f, 18 October 2026.

Proposed: scope or terms under discussion, nothing executed. Contracted: executed obligations. Connected: utility connection energized and confirmed. Commissioned: installation tested with accepted commissioning results. Accepted: service or facility acceptance evidenced. Planning targets are not commitments.

## 工程重点｜GB300 液冷至 Vera Rubin

我们的开发重点包括 GB300 液冷设施和 Vera Rubin 基础设施。各平台的热管理基准不同，相应影响供电、冷却与建筑设计。

- **机柜端供电。** 将租户设备清单转化为配电、韧性与计量要求。
- **按平台确定冷却方案。** GB300 的 CPU 与 GPU 采用液冷，其他部件采用风冷。Vera Rubin 的全液冷架构改变了这一设计基准。
- **为系统预留空间。** 将冷却分配单元、管路、线缆路径和维护通道与机柜布局协调。

GB300 每机柜 36 个 Grace CPU；72 个 GPU，NVL72 机柜配置。

技术参考：NVIDIA GB 机架硬件指南。以上为公开参考设备参数，并不代表 Lintel 容量。设计基准以各项目实际选用的设备为准，包括其他液冷平台。

## 项目如何推进

每个阶段形成下一阶段所需的资料与协议。进度计划取决于具体站点、租户及交付结构。

1. **01 Qualify｜核实基础**：确立站点与电力基准。阶段资料：站点评估 · 公用事业资料 · 许可路径 · 未决条件。
2. **02 Design｜设计**：确定设施及交付范围。阶段资料：设计基准 · 责任矩阵 · 成本计划 · 分阶段进度计划。
3. **03 Deliver｜交付**：按约定范围建设并调试。阶段资料：已批准的交付范围 · 建设施工进展 · 调试结果。
4. **04 Operate｜运营**：验收、移交并规划后续。阶段资料：验收记录 · 运营移交 · 维护与扩展计划。

项目容量需同时说明口径：公用事业供电、关键 IT 负荷及开发阶段。服务日期取决于接入、许可、建设与资金计划。

来源：Lintel 现行官网首页工程重点及 Platform 开发阶段页，2026年10月19日逐字核对，网站版本 847bd0f（2026年10月18日）。这是参考设备与项目流程说明，不是项目容量或供应商承诺。

## 图注、合作对象与状态词

封面：Lintel 建筑研究图——概念方案，并非已拥有或已完工的设施。

交付与运营伙伴：从事设计、许可、设备、施工及设施运营的专业伙伴。

状态词：Proposed（拟议）指范围或条款仍在讨论，尚未签署执行；Contracted（已签约）指已有签署生效的义务；Connected（已接通）指公用事业连接已送电并确认；Commissioned（已调试）指安装已测试并取得获认可的调试结果；Accepted（已验收）指服务或设施验收已有证据。规划目标不是承诺。


## Website discussion tools / 官网交流入口

https://lintelinfra.ai/start

The project-brief tool creates a local file for you to review and email yourself. It does not submit or store the brief on a server.

项目概要工具在本机生成文件，由使用者检查后自行发送；不会向服务器提交或保存概要。

## Website presentation update / 官网展示更新 — 2 November 2026

The current illustrations explain campus, equipment and cooling interfaces. They do not establish owned or delivered facilities, inventory, equipment specifications or supplier relationships. Actual contracts and selected equipment define each project.

现行配图用于说明园区、设备和冷却接口，不代表自有或已交付设施、库存、设备规格或供应商关系。项目边界以实际合同和选定设备为准。